REAL QUESTIONS SUBMIT MATERIAL ADVERTISE
Braindumps

Microsoft

Cisco

Citrix

CIW

CompTia

CWNA

Apple

Adobe

HP

Legato

Exin

Filemaker

Brocade

Ericsson

TIA

Veritas

ISEB

SCP

IISFA

ISM

OMG

Apc

Mile2

Foundry

Huawei

McData

Symantec

TeraData

RedHat

Solar Winds

Blue Coat

Riverbed

 

 
 
Click on name of dumper to view the dump
 

Cassie Lopez

Thomas

Julian

Timothy

Garrett

 
 

 

Braindumps of PMI-001
Project Management Professional

 

Exam Questions, Answers, Braindumps (PMI-001)

This braindumps is provided with ratings from different students. I used www.examcheats.net study material and the exam was not a problem for me.

Question: 1.
Although they have a variety of side-effects, the primary objective of incentive clauses in a contract is to:
A. Aligning contractor and buyer goals.
B. Reduce risk for the contractor
C. Controlling contractor costs
D. Reduce costs to the buyer
E. Reducing production costs.
Answer: A

Question: 2.
During execution, a resource is added to the project team. What effect will this have on the project?
A. The effect cannot be determined.
B. The project duration will be shortened.
C. A scope change will be required
D. The quality of the project will be increased.
Answer: A

Question: 3.
A benefit-cost ratio of 3.22 indicates a:
A. Profit of s3.22 per unit produced.
B. Profit of s3.22 for each dollar expended.
C. Resources assigned to other tasks on the critical path.
D. Payback of s3.22 for each dollar expended.
Answer: D

Question: 4.
Certain resources have been added to tasks on the critical path so as to reduce the project duration. As a result the plan should then be reviewed for the:
A. Possible lag time on other paths.
B. Resource assigned to other tasks on the critical path.
C. The most time consuming task remaining in the plan.
D. Emergence of a new critical path.
Answer: D

Question: 5.
Which of the following terms is used to refer to the adjustment of task schedules to result in more effective human resource deployment?
A. Resource fast tracking.
B. Resource planning
C. Resource leveling.
D. Resource crashing.
E. Resource loading.

Question: 6.
Work packages are described in the:
A. Work charter.
B. Work schedule.
C. Work breakdown structure.
D. Work project plan.
E. Statement of work.
Answer: C

Question: 7.
During project lose-out, the final task is to….
A. Verify that contractual obligations were met.
B. Transfer the deliverables to the client.
C. Reassign team member.
D. Complete performance/lessons-learned records.
Answer: B

Question: 8.
Which of the following concepts are associated with the “Cost of Quality” in project management? (Choose all that apply)
A. Appraisal costs
B. Management costs
C. Prevention costs
D. Failure costs
E. Planning costs
Answer: A, C, D

Question: 9.
In an ideal situation resource leveling should be limited to activities with___?
A. With zero float time.
B. With negative float time.
C. With positive float time.
D. With critical float time
E. On the critical path.
Answer: C

Question: 10.
Which of the following is NOT a function of a kick-off meeting?
A. Project cost estimation and presentation.
B. Introducing the stakeholders.
C. Identifying goals of the project.
D. Obtaining commitment from all participants.
Answer: A

PMI-001

 

 

 

Braindumps Real exam questions and verified answers - 100% passing guarantee - cheap prices.

 

Free brain dumps Braindumps, notes, books for free

 

Braindumps and Exams - Instant download real exam questions - Passing guarantee.

Follow us on FaceBook
Braindumps on Facebook
 
 
 
 
 

CheckPoint

Linux

Novell

DB/2

Network Appliance

EC-Council

Nortel

McAfee

Juniper

ISACA

PMI

Sybase

EMC

HDI

SNIA

ISC

Sair

IBM

Lotus

Exam Express

3COM

BICSI

DeLL

Enterasys

Extreme Networks

Guidance Software

Computer Associates

Network General

SAS Institute

Alcatel Lucent

SeeBeyond

TruSecure

Polycom

Hyperion

Hitachi

Nokia

Fortinet

Vmware

Fujitsu

Tibco

Intel

PostgreSQLCE

BusinessObjects

RESSoftware

BlackBerry

AccessData

ICDL

Isilon

SAP

The Open Group

ACSM

Altiris

Avaya

Cognos

F5

Genesys

SDI

ACI

ASQ

Google

H3C

HIPAA

HRCI

SOA

IIBA

Zend