REAL QUESTIONS SUBMIT MATERIAL ADVERTISE
Braindumps

Microsoft

Cisco

Citrix

CIW

CompTia

CWNA

Apple

Adobe

HP

Legato

Exin

Filemaker

Brocade

Ericsson

TIA

Veritas

ISEB

SCP

IISFA

ISM

OMG

Apc

Mile2

Foundry

Huawei

McData

Symantec

TeraData

RedHat

Solar Winds

Blue Coat

Riverbed

 

 
 
Click on name of dumper to view the dump
 
James
 
 

 

Braindumps of 922-096
Comm.Server 1000 Rls.5.0 Branch Office Install & Comm.

 

These are Guaranteed question for this exam. I only used www.exams.ws guide and i was succedded.


QUESTION NO: 1
You are defining generic settings for the Network Routing Service (NRS) server. Which is the correct entry or definition of the NRS Server Host name?
A. the node ID addressof the SIP Proxy
B. the ELAN IP addressof the Call Server
C. the TLAN IP addressof the Primary NRS
D. the alias of connected host Signaling Server
Answer: D


QUESTION NO: 2
In a Communication Server (CS) 1000 Rls. 5.0 Branch Office solution, which hardware component is required to host the Network Routing Service (NRS) software?
A. Call Server
B. Signaling Server
C. MRV Terminal Server
D. Media Gateway Controller (MGC)
Answer: B


QUESTION NO: 3
You are adding a Communication Server (CS) Rls. 5.0 Branch Office as an end point to an existing CS 1000 network. Which Network Routing Service (NRS) component must be enabled to let the Terminal Proxy Service (TPS) query the NRS using the UNIStim protocol?
A. Media Gateway Controller (MGC)
B. Network Connection Service (NCS)
C. File Transfer Protocol (FTP) Query tool
D. H.323 Gatekeeper Time-to-Live Query tool
Answer: B


QUESTION NO: 4
A customer is implementing a Communication Server (CS) 1000 Rls. 5.0 Branch Office solution. The customer wants to know if there are any special package requirements beyond the base CS 1000 Rls. 5.0 software? Which software package is mandatory when deploying a CS 1000 Rls. 5.0 Branch Office?
A. Branch Media Gateway package 390
B. Network Signaling (NSIG) package 37
C. Network Alternate Route Selection (NARS) package 58
D. SIP Gateway and Converged Desktop (SIP) package 406
Answer: A


QUESTION NO: 5
A customer recently deployed a Communication Server (CS) 1000 Rls. 5.0 Branch Office solution. When examining the Call Server database of the main office, you observe that the bandwidth management zone created for the Branch Office on the main office is the same number as the zone created on the Branch Office. Which programming change will you recommend?
A. Add a new bandwidth management zone, zone 0, on the main office.
B. Make no changes to the main office or branch office zone numbering scheme.
C. Change the zone number on the main office to prevent potential conflicts with the branch office.
D. Change the zone number on the branch office to prevent potential conflicts with the main office.
Answer: B


QUESTION NO: 6
You are implementing a Communication Server (CS) 1000 Rls. 5.0 Branch Office solution where the Virtual Office feature is required. Which prerequisite programming is required at the customer level (LD 15) before programming the feature on the individual telephone?
A. Create a virtual D-channel.
B. Define the customer AUX ID.
C. Add a virtual bandwidth management zone.
D. Define the Station Control Password (SCPW).
Answer: D


QUESTION NO: 7
A customer is implementing a Communication Server (CS) 1000 Rls. 5.0 Branch Office solution. The Branch Office IP users should be registered at the main office. The Network Connection Server (NCS) has already been enabled on the Network Routing Service (NRS). In the NRS, what needs to be entered to allow the Branch Office (BO) user to register to the main office?
A. the Branch User ID (BUID) as a NXX number
B. the Branch User ID (BUID) as a CDP number
C. the Network User ID (NUID) as a SPN number
D. the Numbering Plan Area (NPA) code for the BO
Answer: B


QUESTION NO: 8
The customer wants to use Element Manager to maintain their Communication Server (CS) 1000 Rls. 5.0 Branch Office Call Server for Element Manager. Which prerequisite programming is mandatory to use Element Manager?
A. Add a virtual D-channel.
B. Add an H.323 virtual route.
C. Change the default Level 1 password.
D. Add at least two Pseudo terminals (PTYs).
Answer: D


QUESTION NO: 9
You are adding a TIE trunk using Element Manager LD 16. The customer wants to be sure that digits outpulse as soon as the connection is established. Considering the customer's requirements, which arrangement should you assign?
A. Off hook (OHK)
B. Delay Dial (DDL)
C. Wink Start (WNK)
D. Immediate Start (IMM)
Answer: D

922-096


 

 

 

Braindumps Real exam questions and verified answers - 100% passing guarantee - cheap prices.

 

Free brain dumps Braindumps, notes, books for free

 

Braindumps and Exams - Instant download real exam questions - Passing guarantee.

Follow us on FaceBook
Braindumps on Facebook
 
 
 
 
 

CheckPoint

Linux

Novell

DB/2

Network Appliance

EC-Council

Nortel

McAfee

Juniper

ISACA

PMI

Sybase

EMC

HDI

SNIA

ISC

Sair

IBM

Lotus

Exam Express

3COM

BICSI

DeLL

Enterasys

Extreme Networks

Guidance Software

Computer Associates

Network General

SAS Institute

Alcatel Lucent

SeeBeyond

TruSecure

Polycom

Hyperion

Hitachi

Nokia

Fortinet

Vmware

Fujitsu

Tibco

Intel

PostgreSQLCE

BusinessObjects

RESSoftware

BlackBerry

AccessData

ICDL

Isilon

SAP

The Open Group

ACSM

Altiris

Avaya

Cognos

F5

Genesys

SDI

ACI

ASQ

Google

H3C

HIPAA

HRCI

SOA

IIBA

Zend