1 What time
fence is not used in master planning?
A. Freeze time fence
B. Vendor time fence
C. Coverage time fence
D. Explosion time fence
Answer: B
2 Abc .com has limited capacity on their machines,
but the capacity of the operators is unlimited (already
set on the work center). The team manager wants to
plan on the machinery and see the required staff hours
in the production plan. What setup is BEST in order
to meet the manager requirements?
A. The route is set up with two operations with different
operation numbers, one to control the operator and
one to control the machinery. Schedule with finite
capacity.
B. The route is set up with the use of priority on
operations. The scheduling is done with infinite capacity,
and the task group is created on the operator resource.
C. The route is set up with the use of priority on
operations, and scheduling is done with infinite capacity.
D. The Route is set up with two operations with the
same operation number, one to control the operator
and one to control the machinery. Schedule with finite
capacity.
Answer: D
3 The plant you manage has been out of operation recently
because of damage sustained by a hurricane. After
running master scheduling, it is clear that delivery
dates are not going to be met. What report will show
you the orders that are not going to be delivered
on time?
A. Requirement profile
B. Order lines
C. Futures
D. Actions
Answer: C
4 How can posting the picking list in the ledger be
avoided?
A. Override the default setting when posting the picking
list journal.
B. It cannot be avoided.
C. A setting in the production parameters.
D. A setting in the inventory management parameters.
Answer: C
5 A BOM item must be painted by a sub-contractor as
a part of the route. What is the best way to model
this in Axapta?
A. Create an operation and specify a quantity category
for the painting job.
B. Create an operation and attach a work center of
type vendor, and specify a service item in the operation
for the painting job.
C. Create an item of type service and create an operation.
Set line type to Vendor on the BOM line, and link
the item in the BOM to the specific operation in the
route.
D. When creating the production order, select type
vendor.
Answer: C
6 All items in inventory have a batch number. The
batch number is not being printed in the production
picking list journal. What can be done to ensure the
batch number is printed on the report?
A. Set it up on the production picking list journal.
B. Set it up in the production parameters.
C. Set it up when printing the production picking
list journal.
D. Set it up in the production order default values.
Answer: C
7 When the production ledger setting is 'Item + Category',
what ledger accounts are used for posting work center
consumption?
A. The ledger accounts specified on cost categories
attached to the operations.
B. The ledger accounts specified on the work center
group used by each operation in the route.
C. The ledger accounts specified in the set up of
the routing groups.
D. The ledger accounts specified on the work center.
Answer: A
8 The item coverage form allows the item coverage
records for one item to be copied to another. What
must the items have in common to use copy?
A. Items must belong to the same inventory dimension
group so they have the same coverage dimensions.
B. Both items must have existing coverage records
C. Items must belong to the same item group.
D. Items must belong to the same inventory model group.
Answer: A
9 There are 100 units of an item on hand. A sales
order for 40 units with a delivery date in 20 days
is entered. Why would master scheduling create a planning
purchase order to cover the sale, instead of using
the existing inventory?
A. The firming time fence is less than 20.
B. Positive days is less than 20.
C. Negative days is less than 20.
D. The coverage time fence is less than 20.
Answer: B
10 How can a fixed material consumption be handled
as an addition to the variable material consumption
on the BOM line?
A. Set the scrap on the operation that consumes the
material.
B. Create a BOM line with constant consumption.
C. Set a variable and constant material consumption
directly on the BOM line.
D. Select the material consumption on the BOM line
to onstant and add the additional consumption
Answer: B
11 When manufacturing prototypes, it is desirable
to have all ledger transactions posted to separate
ledger accounts specifically created for prototype
accounting. Which of the following is the best practice
to accomplish this?
A. Create special journals with separate ledger accounts
for posting the prototype productions.
B. Keep a log of used voucher numbers in the prototypes.
C. Create an item group for prototype items with separate
accounts, and set up cost categories for the work
centers.
D. Create production groups with separate accounts
for prototype production orders.
Answer: D
12 A production has been fully started, but the material
consumption has only been partly posted. When the
remaining material is on-hand, how can ONLY the remaining
quantity be registered and posted in a picking list
journal?
A. Create a picking list journal with the remaining
quantity when reporting the production order as finished.
B. Create and post a picking list journal with the
remaining quantity for the production order.
C. Create a picking list journal with the remaining
quantity when costing a production order.
D. Create and post a picking list journal with the
remaining quantity from the aterial stock out list
Answer: B
13 What are the rules for creating the operation numbers
for a simple network route?
A. The operations are linked together by the next
operation field, which contains the operation number
of the following operation.
B. The operation number must be multiples of 1ten.
C. The first operation in the route must have the
lowest operation number.
D. The last operation in the route must have zero
in its next operation field.
Answer: A,C,D
14 Where are transactions for a specific production
order checked?
A. Ledger posting from item table.
B. Transaction posting in general ledger.
C. Production posting from the production order.
D. Ledger posting from the production order.
Answer: C