REAL QUESTIONS SUBMIT MATERIAL ADVERTISE
Braindumps

Microsoft

Cisco

Citrix

CIW

CompTia

CWNA

Apple

Adobe

HP

Legato

Exin

Filemaker

Brocade

Ericsson

TIA

Veritas

ISEB

SCP

IISFA

ISM

OMG

Apc

Mile2

Foundry

Huawei

McData

Symantec

TeraData

RedHat

Solar Winds

Blue Coat

Riverbed

 

 
 
Click on name of dumper to view the dump
 
Chun
 
 

 

Braindumps of 000-867
i5 iSeries Technical Solutions Implementer V5R3

Exam Questions, Answers, Braindumps (000-867)

After passing paper i can truly say that its no more easy and some question are really tricy. I am really thankful to www.exams.ws for good exhibits.

NO: 1 Abc .com is planning to migrate their existing Linux applications currently running on an intel server to an eServer i5 520. What needs to be done before the Linux applications will run on the PowerPC technology?
A. Linux ODBC driver must be installed before applications can be accessed on the 520 system
B. Compile the applications using a cross-compiler that runs on an Intel system for PowerPC platforms.
C. Intel Linux applications need to be re-compiled to run on PowerPc
D. Install the PASE feature in the hosting i5 /OS partition
Answer: C

NO: 2 A user is signed on to an HMC with a profile that has "hmcoperator" privileges. They are formatting a DV for use as a "Backup Cartridge", and the HMC reports a DVD error. Which of the following is the best course of action to correct the problem?
A. Ensure the DVDD media is a DVD-RAM
B. Ensure the user profile has "hmcservicerep" privileges to format the DVD cartridge
C. Ensure the DVD media is a DVD+RW
D. Ensure the user profile has "savrst" privileges to format the DVD cartridge
Answer: A

NO: 3 During a disaster recovery test, the users report that pending application transactions stored in Data Queues did not complete once the system was reloaded and restarted. Which of the following is the cause of the problem?
A. Allow object difference *ALL was not specified on the restore command
B. The contents of data queues are not saved by standard OS/400 save commands
C. The profile used to restore the system did not have authority to the RSTDTAQE command
D. The SAVQENT parameter was not specified as *DTAQ or *ALL on the original save command
Answer: B

NO: 4 After performing a side-by-side system upgrade, both the old and new systems are on the network at the same time. The customer experiences periodic failures while attempting TCP/IP communications with the two systems. Which of the following may be contributing to these failures?
A. The default rout on the new iSeries server is incorrect
B. The subnet mask values for the TCP/IP interfaces on the two systems do not match.
C. The Local Adapter Address parameter in the Line description is the same on both system.
D. Both systems do not have the same value for Network Attributes (CHGNETA) parameter LCNETID.
Answer: C

NO: 5 An eServer i5 520 configuration includes the system unit, two FC #5095 towers, and two IXA attached xSeries servers. When cabling this system, what is the recommended placement for the units in the SPCN loop?
A. 520 -> IXA -> FC #5095 -> FC#5095 -> IXA -> 520
B. 520 -> IXA -> FC #5095 -> IXA ->FC#5095 -> 520
C. 520 -> FC #5095 -> IXA -> IXA -> FC #5095 -> 520
D. 520 -> FC #5095 -> FC #5095 -> IXA -> IXA -> 520
Answer: C

NO: 6 A model 830 running OS/400 V5R2 is being migrate to a new, scratch install, i5/OS partition on an eServer i5.570. Due to business requirements a "previous release migration" procedure is required. Which of the following describes a required step to successfully complete the upgrade process?
A. Th V5R2 release upgrade PTFs must be installed on the 830 prior to performing the full system save for the migration
B. After the base i5/OS installation, an i5/OS device description for the V5R3 distribution media must be created to accept licensing terms and conditions
C. On the i5 partition, a DST alternate load device must be selected to load base OS/400, QGPL and QUSRSYS from the 830 system save media.
D. The V5R2 release upgrade menu to create the migration library must hav been run on the 830 prior to the full system save for the migration
Answer: B

NO: 7 Selecting the 'availability' option when changing 'Parity Set Optimization' when iSeries Navigator is used to ensure which of the following?
A. The RAID-5 parity set is formatted with its disks attached to I/O adapters on different PCI buses within an expansion unit
B. The RAID-5 parity set is formed, but a single disk is removed and reserved to mirror the load source disk off the system bus.
C. The RAID-5 parity set is formed with the disks attached to different SCSI busses on the I/O adapter
D. The RAID-5 parity set is formed with the disks attached to different I/O adapters within a single expansion unit bus.
Answer: C

000-867


 

 

Braindumps Real exam questions and verified answers - 100% passing guarantee - cheap prices.

 

Free brain dumps Braindumps, notes, books for free

 

Braindumps and Exams - Instant download real exam questions - Passing guarantee.

Follow us on FaceBook
Braindumps on Facebook
 
 
 
 
 

CheckPoint

Linux

Novell

DB/2

Network Appliance

EC-Council

Nortel

McAfee

Juniper

ISACA

PMI

Sybase

EMC

HDI

SNIA

ISC

Sair

IBM

Lotus

Exam Express

3COM

BICSI

DeLL

Enterasys

Extreme Networks

Guidance Software

Computer Associates

Network General

SAS Institute

Alcatel Lucent

SeeBeyond

TruSecure

Polycom

Hyperion

Hitachi

Nokia

Fortinet

Vmware

Fujitsu

Tibco

Intel

PostgreSQLCE

BusinessObjects

RESSoftware

BlackBerry

AccessData

ICDL

Isilon

SAP

The Open Group

ACSM

Altiris

Avaya

Cognos

F5

Genesys

SDI

ACI

ASQ

Google

H3C

HIPAA

HRCI

SOA

IIBA

Zend