REAL QUESTIONS SUBMIT MATERIAL ADVERTISE
Braindumps

Microsoft

Cisco

Citrix

CIW

CompTia

CWNA

Apple

Adobe

HP

Legato

Exin

Filemaker

Brocade

Ericsson

TIA

Veritas

ISEB

SCP

IISFA

ISM

OMG

Apc

Mile2

Foundry

Huawei

McData

Symantec

TeraData

RedHat

Solar Winds

Blue Coat

Riverbed

 

 
 
Click on name of dumper to view the dump
 
Dominic
 
 

 

Braindumps of HP0-064
HP BladeSystems C-Class Solutions 1

 

Exam Questions, Answers, Braindumps (HP0-064)
This braindump will be helpful to you. Try it.


QUESTION 1
What is the function of the internal USB connector on a BladeSystem c-Class server blade?
A. flash boot-drive capability
B. access for a USB hub
C. configuring rapid deployment
D. disk-on-key authentication
ANSWER D


QUESTION 2
A server blade sleeve is required for which BladeSystem p-Class servers? (Select two.)
A. ProLiant BL30p
B. ProLiant BL25p
C. Integrity BL60p
D. ProLiant BL35p
E. ProLiant BL20p
ANSWER A,D


QUESTION 3
To complete the installation and ensure proper cooling, which step should you take after you have installed the server blades in a BladeSystem c-Class enclosure?
A. Install redundant cooling fans.
B. Install blade and fan blanks.
C. Use Thermal Logic software to restrict BTUs
D. Activate the Insight Display and check for error messages.
ANSWER B


QUESTION 4
If Instant Support Enterprise Edition (ISEE) services have been installed on a system, which event results directly in notification to an HP support engineer?
A. a configuration error detected by Insight Display
B. any SNMP trap in Open Service Event Manager (OSEM)
C. an SNMP trap in OSEM that passes through event filters and indicates the need for service
D. an event that meets predetermined conditions in ISEE
ANSWER B


QUESTION 5
How does Virtual Connect appear on the network?
A. as a Pass-Thru
B. as both virtual and physical servers
C. as a switch
D. as resource partitions between CPUs
ANSWER A


QUESTION 6
When a c-Class enclosure is configured as AC Redundant with redundant line feeds, and the system experiences a line feed failure, what is the result?
A. Available power is allocated to the server blades according to their device bay number (zone) in the enclosure.
B. The Onboard Administrator shuts down the number of servers necessary to permit the system to run with the available power.
C. The Onboard Administrator reboots the servers, accesses the individual ROM-Based Setup Utilities (RBSUs), and optimizes the Power Regulator settings.
D. The system keeps running with no loss of performance.
ANSWER D


QUESTION 7
Which HP service would you suggest for a customer who wants help preparing their site that covers security issues, enterprise management considerations, and power and cooling solutions?
A. Smart Cooling Services
B. Factory Express Services
C. Consolidated Client Infrastructure (CCI) Services
D. HP Datacenter Environment Services
ANSWER D


QUESTION 8
In a BladeSystem c-Class enclosure, how are the interconnects connected to the device bays?
A. 100-pin connectors
B. connections are hard-wired
C. RJ-45 cables
D. CAT5 cables
ANSWER B


HP0-064

 

 

 

Braindumps Real exam questions and verified answers - 100% passing guarantee - cheap prices.

 

Free brain dumps Braindumps, notes, books for free

 

Braindumps and Exams - Instant download real exam questions - Passing guarantee.

Follow us on FaceBook
Braindumps on Facebook
 
 
 
 
 

CheckPoint

Linux

Novell

DB/2

Network Appliance

EC-Council

Nortel

McAfee

Juniper

ISACA

PMI

Sybase

EMC

HDI

SNIA

ISC

Sair

IBM

Lotus

Exam Express

3COM

BICSI

DeLL

Enterasys

Extreme Networks

Guidance Software

Computer Associates

Network General

SAS Institute

Alcatel Lucent

SeeBeyond

TruSecure

Polycom

Hyperion

Hitachi

Nokia

Fortinet

Vmware

Fujitsu

Tibco

Intel

PostgreSQLCE

BusinessObjects

RESSoftware

BlackBerry

AccessData

ICDL

Isilon

SAP

The Open Group

ACSM

Altiris

Avaya

Cognos

F5

Genesys

SDI

ACI

ASQ

Google

H3C

HIPAA

HRCI

SOA

IIBA

Zend